Specifications include, but are not limited to: 7.00 EACH BEAMS, PRETENS. PRESTR. CONC.; 1.20 ACRE CLEARING & GRUBBING; 1.00 LUMP SUM CONSTRUCTION SURVEY; 90.00 LINEAR FOOT CULVERT PIPE; 360.00 CUBIC YARD EMBANKMENT-IN-PLACE; 953.00 SQUARE YARD ENGINEERING FABRIC; 320.00 CUBIC YARD EXCAVATION CLASS 10; 190.00 CUBIC YARD EXCAVATION CLASS 20; 1.00 EACH FIELD LABORATORY/OFFICE; 125.00 LINEAR FOOT GUARDRAIL, FORMED STEEL BEAM; 994.70 SQUARE YARD LONGITUDINAL GROOVING IN CONCRETE; 283.30 CUBIC YARD MODIFIED SUBBASE; 0.90 ACRE MULCHING; 0.80 ACRE NATIVE GRASS SEEDING; 888.30 SQUARE YARD PAVED SHOULDERS; 9.24 STATION PAVEMENT MARKINGS; 70.30 SQUARE YARD PAVEMENT, P.C.C.; 1,235.00 LINEAR FOOT PILE, STEEL H, 14 IN.; 190.20 LINEAR FOOT RAIL, CONCRETE BARRIER; 2,336.00 POUND REINFORCING STEEL; 43,881.00 POUND REINFORCING STEEL, EPOXY COATED; 941.60 SQUARE YARD REMOVAL OF PVMNT/DRIVES/SDWK; 835.00 TON REVETMENT; 4.90 STATION SHOULDER CONSTRUCTION; 1.00 STATION SHOULDER FINISHING; 776.00 LINEAR FOOT SILT FENCE; 0.90 ACRE STABILIZING CROP, SEED & FERT.; 4.00 EACH STEEL BEAM G'RAIL BARRIER TRANS SECTION; 235.00 CUBIC YARD STRUCTURAL CONCRETE; 4,319.00 POUND STRUCTURAL STEEL; 457.80 LINEAR FOOT SUBDRAIN, LONGITUDINAL; 240.00 CUBIC YARD TOPSOIL, STRIP/SALVAGE/SPREAD;