Specifications include, but are not limited to: a. REVIEW AND UPDATE SPCC PLANS (1) Current SPCCs shall be reviewed and rewritten with updates for all locations specified in Attachment A: Site List for Spill Prevention, Control and Countermeasure (SPCC) Plans in accordance with requirements set forth in 40 CFR § 112, AR 200-1/Chapter 4, 7 & 11, all applicable federal, and state/local environmental laws and regulations. (a) The Contractor shall prepare Draft, Draft Final, and Final SPCC Plans for all locations specified in Attachment A. If deemed necessary by DMVA-FMO/ENV in consultation with the Contractor, additional drafts may be prepared for review to resolve all comments and concerns. (b) Plans shall be rewritten with an emphasis on “How To Comply” and shall follow the outline in Attachment B: SPCC Outline. Any deviations from this format shall be reviewed and approved by the DMVA-FMO/ENV office. (c) Verbiage concerning monthly tank inspections shall be updated (if necessary) to reflect that tank inspections are conducted periodically by personnel that are knowledgeable of storage facility operations, characteristics of the liquid stored, the type of Aboveground Storage Tank, and its associated components. (d) Draft plan submittals shall include an MS Word file and a “clean copy” Adobe PDF file. DMVA- FMO/ENV will provide comments on drafts by using the MS Word “Track Changes” feature. (e) The Contractor shall be required to constructively resolve all DMVA- FMO/ENV office comments and concerns. (f) The Contractor shall allow AKARNG staff review periods of approximately three (3) weeks per draft plan. (2) The Contractor shall visit each identified facility. (a) The existing SPCC Plans shall be studied for site-specific familiarization. DMVAFMO/ENV shall provide existing plans in electronic format. (b) Each AKARNG location shall be individually evaluated on-site, by a Professional Engineer currently registered in the State of Alaska, or an authorized and qualified agent of that engineer. (c) During the site visit, the Contractor shall verify that information displayed on the site map is accurate and reflects the true and current condition of each site. (d) The Contractor shall compile and supply DMVA-FMO/ENV with a list of deficiencies, if any, for each facility within 10 days of visiting that facility. (3) Final plans shall be delivered no later than 30 days before the technical amendment deadline, as required by 40 CFR § 112.5.