All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: 2.1 Contractor shall install new upper and lower cabinets. 2.2 Contractor shall install new water and waste lines to include core drilling the floor to access existing supply and waste lines, new pee trap and new double bowl stainless steel sink with gooseneck faucet. 2.3 Contractor shall install cabinets to be 9' sections to receive 24" deep upper cabinets with doors and pulls. Lower to receive 30" deep base cabinets with doors and pulls stainless steel sink with faucet. Second set of cabinets 6' lower cabinets with doors and one section of drawers. New solid surface countertop shaped to go over both sections of base cabinets. Contractor shall open drywall as needed to install new plumbing, repair and replace any removed drywall. 2.5 Contractor shall install 4 dedicated 20 amp GFI receptacles 2 on south wall and 2 on west wall. 2.6 The awarded contractor will perform all installation and operations according to manufacturer's standards and guidelines. 2.7 All work shall meet all applicable uniform building codes, electrical codes, and industry standards