Specifications include, but are not limited to: 1. Complete demolition of the main structure and all out buildings. 2. Removal of all debris, equipment, vehicles, tires, concrete blocks, rubbish, dead trees, brush, stumps and materials from the site. Absolutely none of these listed items nor any of the building debris, nor other trash or debris may be buried or left to remain on the property under any circumstance. 3. Proper disposal must be used for all debris, equipment, vehicles, tires, concrete blocks, rubbish, appliances, trees, trash, materials, etc. in commercial landfills. Burning of any type is not authorized at the site. Valued scrap material may be salvaged for later sale, but must be removed from the site by the Contractor at the time of demolition. Landfill tickets accounting for all project demolition debris must be submitted with requests for payment. Building debris must be taken to a properly licensed landfill within forty-eight (48) hours of removal from the site. 4. As part of the quote documents, the Winnebago County Health Department has ordered an asbestos inspection. Attached are copies of the asbestos inspection reports indicating the presence or absence of asbestos in each building. If present, the Bidder is responsible for proper abatement of such asbestos. All asbestos removal shall be performed in accordance with EPA regulations. When asbestos abatement is required, confirmation must be provided to the Winnebago County Health Department (WCHD), by the licensed asbestos abatement contractor, that the abatement has been completed prior to the beginning of any demolition. The licensed State of Illinois Asbestos Abatement Contractor shall remove and dispose of any identified asbestos in accordance with OSHA, EPA, DNR, Federal, State, and local requirements. Any HVAC or refrigeration equipment, and any unknown liquids or materials encountered on the property shall be properly handled, removed and disposed of by the contractor or a subcontractor utilizing appropriate approved procedures including hazardous materials procedures.