Specifications include, but are not limited to: Consisting of approximately 19 Curb Ramps; 3,035 L.F. of Curb and Gutter; 1,000 S.Y. of P.C.C. Sidewalk; 18 S.Y. of Colored Concrete; 10 C.Y. of P.C.C. Structure/Retaining Wall; 960 Tons of A.C. Pavement; 1 Catch Basin; and other related work.; • Construction of pedestrian improvements adjacent to the Chinook Elementary school frontage on W. 88th Avenue and reconstruction of associated sidewalk, retaining wall, curb and gutter, signing and striping, curb ramps, fencing, and pavement of the school parking lot and roadway.; • Roadway narrowing along Patterson Street at Potomac Drive adjacent to Chester Valley Elementary school and reconstruction of associated sidewalk, curb and gutter, pavement, signing and striping, driveways, and ADA curb ramps.; • Construction of traffic circle at the intersection of Stewart Street and Kenai Avenue and pedestrian improvements on Kenai Avenue, Davis Street, and Lionheart Drive within the Wonder Park Elementary school walking route. Includes construction of associated existing sidewalk, curb and gutter, storm drain, pavement, signing and striping, driveways, and curb ramps.;