Specifications include, but are not limited to: Property Insurance shall cover the use of all equipment, hoist, andmotor vehicles on the site, or hauling materials or debris from thesite and Demolition Insurance. All building materials are to beremoved including footings and patios.Any basements, understructure,oraccessorystructuremustbefilledwithcompacted compatible soil.Furnish acceptable fill material(black dirt) to leave lot with proper slope for water runoff andmowable condition.Lot shall be seeded for grass to be able togrow.All utilities must be properly disconnected prior todemolition per City requirements.Work should be completedwithin 20 days from acceptance of bid.Contractor will bring inalllandfill receiptsfrom the Bourbon County Landfillto theCodes Manager to ensure payment.