Specifications include, but are not limited to: Site 1 - Wyoming Avenue between Lamb Boulevard to Arden Street: Replace approximately 2,700-feet of existing 8-inch ACP pipeline, service laterals, and fire hydrants.; Site 2 - Palos Verdes Street between Albert Avenue and Twain Avenue: Replace approximately 2,500-feet of 6-inch ACP with 8-inch pipeline, service laterals, and fire hydrants.; Site 3 - Boulder Highway between Nellis Boulevard and Harmon Avenue: Replace approximately 875-feet of existing 8-inch and 10-inch ACP with 10-inch pipeline, service laterals, and fire hydrants.; Site 4 - Spring Mountain Road between Sammy Davis Jr. Drive and Mel Torme Way Replace approximately 525-feet of existing 8-inch ACP with 12-inch pipeline, service laterals, and fire hydrants.; Site 5 - Vegas Plaza Drive near Sammy Davis Jr. Drive: Replace approximately 300 feet of 8-inch ACP with 12” pipeline.