Specifications include, but are not limited to: Works consist of demolition and roof preparation, deck repair/replacement, rough carpentry, insulation, membrane flashing, sheet metal/flashing, walkway pads, ground and hazardous materials disposal.; 3.01 Deck Repair/Replacement: A. Remove obsolete roof penetrations (verified by facility personnel.); B. Remove and replace existing deteriorated decking to match existing deck as directed by the Architect/Engineer, if found to be damaged. Provide unit price.; 3.02 Rough Carpentry: A. Install nailers, where required, to match height of new insulation, as detailed.; B. Install nailers for curb extensions, as required, for minimum curb height of 8" above new membrane.; 3.03 Insulation: A. Install insulation in accordance with specifications and details, joints butted tight. Note: All joints are to be staggered and offset 50% from the previous layer.; 3.04 Membrane/Flashings: A. Single Ply Membrane: 1. Install a 60 mil ballasted EPDM roof system.; 2. Install EPDM flashing to all penetrations, perimeters, and wall sections, as detailed.; 3. Install EPDM boots at pipe and plumbing locations.; 3.05 Plumbing Work: A. Replace all missing or damaged drain covers and bolts.; B. Auger all interior roof drains at completion of re-roofing to ensure working order.; 3.06 Sheet Metal/Flashings: A. Install new 24-gauge, pre-finished sheet metal counterflashings at curbs and perimeter locations.; B. Install 24-gauge, pre-finished sheet metal on expansion and control joints where indicated on detail drawings.; C. Install 24-gauge, galvanized accessories where shown on detail drawings.