Specifications include, but are not limited to: A. Work under these specifications are under the jurisdiction of the CHP, who will execute the contract documents, coordinate with the Contractor as necessary, and conduct inspections to ensure the work is being done in strict accordance with the specifications. No deviations from these specifications will be permitted without concurrence and subsequent authorization from the CHP On-Site Contact. B. Contractor shall notify the CHP On-Site Contact of the date and time the service is to be performed one (1) week prior to the actual work. C. Contractor shall sign in/out with the CHP On-Site Contact upon each service call to provide verification the service has been provided. D. Contractor shall take all necessary precautions to protect service locations. Any damage caused by Contractor to state equipment, materials, or other property shall be repaired or replaced by Contractor to the satisfaction of the state at no cost to the state. The state may, at its option, repair any damage and deduct from Contractor the cost thereof. E. Contractor shall take measures to see that all materials left as a result of the work shall be removed.