Specifications include, but are not limited to: This contractor is responsible for all fall protection and safety requirements associated with roof work. When working from lifts & harnesses, or tie-offs provided by this contractor, OSHA standards must be met and followed at all times.; Daily Cleanup of debris. If this contractor does not clean the site to the satisfaction of Whiting Turner, Whiting Turner reserves the right to clean the site with their own forces at the expense of this contractor. Site must be maintained and cleaned daily.; Furnish attic stock as required per the specifications.; This contractor shall furnish and install all sealants integral to the work associated with this bid package.; Wiring diagrams for all electrical devices provided and/or installed by this contractor are to be provided and coordinated with the Electrical/Security Contractor in time for electrical rough-in.; All in wall blocking will be by the drywall contractor, 09A &05C. The 10A Specialties Contractor is responsible to coordinate all in wall blocking required for the scope of work in this bid package with the 09A and 05C contractors, during stud framing and prior to drywall install. If this contractor fails to coordinate blocking requirements with the 09A and 05C contractors than it shall be this contractor’s responsibility to remove installed material to install missed blocking. It shall be this contractor’s responsibility to replace any finished material that had to be removed.; Furnish and install all toilet and bath accessories, including but not limited to the electrical hand dryers, grab bars, mirrors, sanitary napkin disposal bins, toilet seat cover dispenser, soap and towel dispensers, shelves, baby changing station, coat hooks, mop/broom hooks, mop/broom holders, under lavatory guards, etc. Coordinate with the Electrical Contractor for the installation of electric hand dryers. Coordinate with all applicable ADA guidelines.; Provide T10 trash bins, store offsite until after final cleaning.; Provide solid plastic pedestal benches.; Paper towel, toilet tissue, and soap dispensers will be furnished by the owner. The 10A contractor will be responsible to install any paper towel, toilet tissue, and soap dispensers provided by the owner.; Furnish all necessary mounting hardware for a complete installation of toilet and bath accessories.; Furnish and install all corner guards and wall protection as indicated. Include wood top rail at wall covering. Include FRP at Mop sinks. SS-3 wall protection in toilet rooms is by others.; Furnish and install dock bumpers and Dock lock lift.; Furnish and install kilns.; Provide an electronically operated projection screen at stage. Coordination of power requirements is by this Contractor. Line voltage is by 26A.; Furnish and install display cases.; This contractor shall furnish and install all visual display boards, including marker boards, tack boards, tack panels, tack panel backsplash, and visual display rails. Include all required mounting materials, inwall blocking by others.; Furnish and install all cubicle curtains, curtain carriers, and tracks as specified. Coordinate with the 09A contractor for blocking. Coordinate with the MEP trades to make sure the tracks are coordinated with lights, sprinkler heads, diffusers/registers, devices, etc.; Furnish and install all fire extinguisher cabinets both (recessed and surface mounted), fire extinguishers and accessories. Recessed cabinets are to be coordinated with the drywall contractor as necessary. Include all required fire extinguisher signage and stickers. Follow all ADA and IBC mounting guidelines.; Furnish and install all automatic external defibrillator cabinets (recessed, semi-recessed and/or surface mounted), automatic external defibrillators, and accessories. Recessed cabinets are to be coordinated with the drywall contractor as necessary. Included all required signage and stickers. Follow all ADA and IBC mounting guidelines.; Furnish and install all fire extinguisher and defibrillator cabinet signage.; Furnish and install all metal lockers as indicated, including but not limited to metal lockers, hardware, accessories, identification labels, hooks, locks, filler strips, etc. Blocking and/or strapping required for the installation of lockers is by others, however this contractor is responsible for coordination of all blocking/strapping with the Drywall Contractor prior to wall close up