Specifications include, but are not limited to: Rio Rico High School Lockers: Provides changing rooms, showers and other facilities for students. The physical structure of the locker room shower facilities is not comparable for students of one sex to those provided to students of the other sex. ADE reviewers found that Rio Rico High School Boys Locker Room contains a pod style shower facility. However, the Girls Locker Room shower facility has individual shower stalls with shower curtains for each stall. Therefore, the Locker Room facilities are not comparable. SCVUSD shall ensure that the boys’ locker room is comparable/equitable to the girl’s locker room.; Calabasas School: Design for entire campus weatherization project.; Rio Rico High School Plaza: Perform assessment and design for weatherization plaza.