Specifications include, but are not limited to: provide the establishment of a contract to reconstruct the eastern portion of the main parking lot at the KDOT Wichita Hillside offices located at 45th St North and Hillside; pavement removal, subgrade preparation, aggregate base placement with geogrid reinforcement, full depth HMA pavement, and concrete pavement replacement in front of the mechanic's shop. Miscellaneous work includes placement of pavement markings.; The new pavement approaches to the mechanic's shop shall be paid for as Concrete Pavement (9" Uniform)(AE), and shall be constructed using a KDOT-approved Pavement (AE) mix design. This pavement shall be reinforced as shown in the plan details, and the contractor shall drill and grout in tle bars to connect the new pavement to the adjacent mechanic's shop floor slab.