Specifications include, but are not limited to: The project generally consists of: New raw water intake and pump station including: o Concrete structure – foundation, retaining walls, coarse screening face, fine screening channel, pump station wetwell, pipe gallery o Above ground precast concrete building with brick facia and hollow core roof o 3 Vertical Turbine Pumps o 2 retrievable brush cleaned wedge wire screens o 6 coarse screens o Compressed air system o Screening backwash system o Exterior canopy over pumps and screening channel o Associated HVAC, Electrical, and Controls systems ? Riverbank bank stabilization rip-rap including the removal of the upstream barb ? River channel dredging ? Site work including: o 36” transmission pipeline stub-out o Paved/gravel access road and approach off Duck Creek Rd. o Site grading o Fencing