Specifications include, but are not limited to: 1. Exercise support team for complex series of multi-day ASHER operations-based exercise drills. a. Participation in multi-day, block exercise event, consisting of multiple drills conducted over the course of 6 days (tentatively scheduled December 18-23). This series of days will include a day for set-up and controller/evaluator meetings (December 18) and a day for tear-down and hot wash discussion (December 23). Exercise play will take place on the days of December 19, 20, 21, and 22, with morning and evening sessions on each day with time for reset scheduled on each of those days. b. Scheduling and of participation in Initial Planning Meeting (IPM). c. Scheduling and of participation Midterm Planning Meeting (MTM). d. Scheduling and of participation weekly exercise planning meetings taking place during the 6 weeks leading up to exercise, and, as necessary, contribute to agreed upon deliverables, including at a minimum: i. Exercise Plan (ExPlan) and Controller/Evaluator guidance and/or instructions. ii. Scenario development. iii. Exercise Evaluation Guide (EEG) refinement. iv. Refinement of Master Scenario Events List (MSEL). v. Planning of exercise logistics, to include discussion of contingency planning in the event of unforeseen disruptions to the exercise logistics plan. e. Provide personnel to provide exercise support, to include exercise control, exercise briefings, exercise evaluation, personnel to simulate the role of assailant, on-site safety, simulation of weapons, and other areas of specialization, such as set-up, moulage, and other effects. f. Participate in post-exercise Hot Washes at conclusion of exercise activity. g. Participate in post-exercise AAR conference (can be virtual meeting). h. Author sections of exercise AAR as assigned (i.e., capability assessments) and provide revisions and edits for draft exercise AAR.