Specifications include, but are not limited to: Submission of Notifications for the Abatement and Demolition to the Division of Air Quality and the Department of Health and Human Resources through the DEP Electronic Submittal System (ESS) ‐ https://dep.wv.gov/ess/Pages/default.aspx . Asbestos Removal in accordance with the general requirements of the Asbestos NESHAP. Please visit https://dep.wv.gov/daq/CandE/Pages/AsbestosRemovalandDemolition.aspx for complete details regarding the Asbestos NESHAP general requirements. Purchase and remove all equipment, building and related materials that comprise Westmoreland Hall. All equipment, building and related materials is sold on an “as is, where is” condition. BridgeValley does not make any representations of condition/suitability for any purpose nor any other representations or warranty, statutory, implied or otherwise. Disconnect, dismantle and remove all associated infrastructure and utilities*. *Utilities defined as gas, electric, fire water, domestic water, fiber line and fire alarm system. Post demolition and removal of debris, site to be rough graded, dressed with grass seed and straw. Vendor shall ensure the site is left in a clean and tidy condition to the satisfaction of BridgeValley.