Specifications include, but are not limited to: 1. Collection sites will operate from 9:00 AM to 2:00 PM. The City reserves the right to require the Contractor, at no additional cost to the City, to continue collection at any or all sites until 3:00 PM.; 2. The Contractor will be supplied with a list of collection sites a minimum of two weeks in advance of each clean-up date. The Contractor is required to have all scheduled equipment at the assigned collection sites by 8:30 AM. All equipment shall arrive empty and in operable condition and must be removed from the sites by no later than 4:00 PM that same day. A comparable unit shall promptly replace any piece of equipment that becomes inoperable during a day.; 3. The Contractor shall provide a point of contact for the City that will remain available by phone throughout the clean-up day. The Contractor also shall maintain radio or cell phone communication with each of his trucks and cooperate with the City site coordinator to move compactor trucks and/or change out containers throughout the day as directed by the City.; 4. Equipment (including the truck and driver) shall be dedicated solely to the Omaha Clean-up program from 8:30 AM to 3:00 PM for the clean-up day. Filled compactor trucks shall be promptly emptied and returned to the assigned collection site, unless dismissed or otherwise re-directed by the City’s representative.; 5. Where multiple pieces of Contractor equipment are assigned to a single collection site, the Contractor shall limit the loading of more than one truck as directed by the City’s representative. The Contractor shall cooperate with the City and its representatives to maximize program efficiency and to avoid disruption of operations at each collection site.; 6. The Contractor shall transport all material collected in compactor trucks to the Pheasant Point Landfill, 216th St. & Hwy 36, by 3:00 PM of each collection day. The City shall pay all tip fees for materials from the collection sites. The Contractor shall provide to the City a copy of each scale ticket along with a notation of the collection location site(s) from which the load originated.; 7. The Contractor shall work in good faith with the City to provide additional equipment and containers as reasonably possible, in order to handle any unanticipated volumes on a given day. Payment for any unscheduled equipment requested by the City shall be based on the Contractor's bid price.; 8. The Contractor shall provide equipment operators properly licensed by the State of Nebraska and all equipment shall be maintained and operated in accordance with all applicable laws and regulations.; 9. All vehicles and equipment used in the performance of the contract shall be owned or leased by the Contractor.