Specifications include, but are not limited to: Unit Price 1: Relocation of 1/2” conduit. $_____________________ 1. Description: Existing condition, 1/2” conduit impedes installation of new work. (Assume 4 - #12’s). 2. Unit of Measurement: Linear feet of conduit and conductors relocated. 3. Quantity Allowance: Coordinate unit price with adjustment requirements in Section 01210 “Allowances.” 4. Base Bid Quantity: 100 linear feet. Unit Price No. 2: Relocation of 3/4” conduit. $____________________ 1. Description: Existing condition, 3/4” conduit impedes installation of new work. (Assume 4 - #10’s). 2. Unit of Measurement: Linear feet of conduit and conductors relocated. 3. Quantity Allowance: Coordinate unit price with adjustment requirements in Section 01210 “Allowances.” 4. Base Bid Quantity: 100 linear feet. Unit Price No. 3: Relocate 4x4 junction box. $____________________ 1. Description: Existing condition, 4x4 junction box access will be impeded by new construction. 2. Unit of Measurement: Per junction box. 3. Base Bid Quantity: 8 junction boxes. Unit Price No. 4: Relocation of 1/2” conduit with Fire Alarm or Public Address cabling. $____________________ 1. Description: Existing condition, 1/2” conduit (FA or PA) impedes installation on new work. (Assume 18/2 FA or PA cabling). 2. Unit of Measurement: Linear feet of conduit and FA/PA cabling relocated. 3. Base Bid Quantity: 100 linear feet. Unit Price No. 5: Relocate arm-over fire sprinkler head. $____________________ 1. Description: Existing condition, sprinkler head or arm-over piping impedes installation of new work. 2. Unit of Measurement: Per sprinkler head. 3. Base Bid Quantity: 10 sprinkler heads. Unit Price No. 6: Support lighting fixture from structure. $____________________ 1. Description: Existing condition, lighting fixture supported from ceiling grid, not structure. 2. Unit of Measurement: Per lighting fixture. 3. Base Bid Quantity: 25 fixtures.