Specifications include, but are not limited to: Big Oak Entrance and Roadway Paving 1. ENTRANCE ASPHALT (EXIBIT A) A. SAW CUT AND REMOVE +- 3,000 SQUARE FEET OF DETERIORATED ASHPALT B. RAISE THE ELVATION OF THE DETERIORATED ASPHALT WITH AGGRIGATE TO ENSURE POSITIVE DRAINAGE ONCE ELEVATIONS ARE ESTABLISHED. C. INSTALL 3 INCHES OF COMPACTED BASE MATERIAL ASPHALT WITHIN THE PREVIOUS DETERIOATED +- 3,000 SQUARE FEET ASPHALT AREA. 2. BIRD BATH (EXIBIT B) A. INSTALL A LEVELING COURSE OF ASPHALT WITHIN THE +- 1000 SQUARE FEET AREA THAT HAS CONTINUALLY BEEN A BIRD BATH. THICKNESS OF THE LEVELING COURSE IS TO BE DETERMINED BY THE CHOSEN CONTRACTOR ONCE ELEVATIONS ARE ESTABLISHED. 3. WEAR COURSE PAVING (EXHIBIT C) A. SAW CUT AND MILL SIX (6) ADJACENT ROADS AND INTERSECTIONS TO ENSURE A SMOTH TRANSITION AND TIE IN. B. INSTALL TWO (2) INCHES OF COMPACTED WEAR COURSE ASPHALT TO THE ENTIRE +- 50,000 SQUARE FEET ENTRANCE AND ENTRANCE ROADWAY. C. ENSURE THAT THE NEWLY PAVED ROADWAY AND ENTRANCE HAS FALL OR PITCH FROM THE CENTER LINE OUT TO ENSURE POSITIVE DRAINAGE OFF THE PAVEMENT TO ADJACENET GRASS AREAS.