All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: S1 Bid Item 1, Mobilization, Bonding, and Insurance 1 LS - Lump Sum S2 Item 2: Site 1 Fill Headcut 1 EA - Each Fill active headcut per drawings and SOW S3 Item 3: Site 2 Construct Main Channel Plug 120 LF - Linear Foot Construct Site 2 main channel plug per drawings and SOW S4 Item 4: Site 2 Construct Low Profile Channel Plugs 80 CY - Cubic Yard Construct Site 2 low profile channel plugs per drawings and SOW S5 Item 5: Site 2 Construct Entrance Channel, Excavate Pool, and Fill Low Areas 60 LF - Linear Foot Construct entrance channel per drawings and SOW, including pool excavation and filling low areas S6 Item 6: Site 2 Bank Reshaping 500 SF - Square Feet Reshape vertical eroding banks per drawings and SOW S7 Item 7: Site 2 Fence Removal 500 LF - Linear Foot Remove existing fence at Site 2 S8 Item 8: Site 3 Reinforce Main Channel Plug 60 CY - Cubic Yard Reinforce existing main channel plug at Site 3 per drawings and SOW S9 Item 9: Site 3 Construct Low Profile Channel Plugs and Fill Overflow Area 90 CY - Cubic Yard Construct Site 3 low profile channel plugs and fill overflow area per drawings and SOW S10 Item 10: Site 4 Raise Channel Bed and Lower Entrance Channel 60 CY - Cubic Yard Raise channel bed and lower entrance to existing overflow channel at Site 4 per drawings and SOW S11 Item 11: Site 4 Construct Woody Debris Matrix Streambank Treatment 115 LF - Linear Foot Construct woody debris matrix streambank treatment per drawings and SOW S12 Item 12: Site 4 Relocate Tributary Channel 60 LF - Linear Foot Relocate tributary channel at Site 4 per drawings and SOW S13 Item 13: Construct Beaver Habitat Structures 16 EA - Each Construct beaver habitat structures at Site 2 and Site 5 per drawings and SOW S14 Item 14: Site 5 Floodplain Connector Channels 126 LF - Linear Foot Construct connector channels at Site 5 per drawings and SOW S15 Item 15: Broadcast Seed 1 AC - Acre Broadcast seed work areas with Owner-provided seed S16 Item 16: Cobble Purchase and Delivery 200 Procure and Deliver 8" cobble S17 Item 17: Construct Site 6: Excavator 24 HR - Hour Excavator hourly rate, including operator S18 Item 18: Construct Site 6: Track Truck 24 HR - Hour Track truck hourly rate, including operator S19 Item 19: Construct Site 6: Manual Labor 24 HR - Hour Labor hourly rate