Nez Perce Clearwater NF, Lochsa Ranger District, Smith Creek Culvert Replacement, FS Road 101 at Milepost 2.00, Work consists of the removal of an existing 36 inch culvert and replacing with a new 48 inch by 90 ft long CMP. Project consist of, but not limited to clearing the roadway to the project site for contractor access, structure excavation, excavation and reshaping of the channel in the vicinity of the culvert, installation of 48 inch CMP placement of riprap, installation of embankment material, structure backfill, embankment and excavation of the roadway approaches, channel reconstruction. The project is located approx 14 miles east of Kooskia, Idaho in Idaho County. From Kooskia, ID travel east on U.S. Hwy 12 approx 14 miles and turn North onto FSR 101. Travel approximately 2.00 miles to Project Site. Period of Performance estimated July October 2, 2021. Estimated price range between $100,000 - $250,000Nez Perce Clearwater NF, Lochsa Ranger District, Smith Creek Culvert Replacement, FS Road 101 at Milepost 2.00, Work consists of the removal of an existing 36 inch culvert and replacing with a new 48 inch by 90 ft long CMP. Project consist of, but not limited to clearing the roadway to the project site for contractor access, structure excavation, excavation and reshaping of the channel in the vicinity of the culvert, installation of 48 inch CMP placement of riprap, installation of embankment material, structure backfill, embankment and excavation of the roadway approaches, channel reconstruction. The project is located approx 14 miles east of Kooskia, Idaho in Idaho County. From Kooskia, ID travel east on U.S. Hwy 12 approx 14 miles and turn North onto FSR 101. Travel approximately 2.00 miles to Project Site. Period of Performance estimated July October 2, 2021. Estimated price range between $100,000 - $250,000.