Specifications include, but are not limited to: Replacement of approximately 6,500 linear feet (LF) of water main along Main Street (Route 3) and Old North Main Street extending from Warren Street to Foster Street. Work includes a horizontal directional drill across the Baker River and a crossing beneath the Plymouth & Lincoln Railroad at Old North Main Street. Installation of approximately 1,700 LF of force main and gravity sewer along Main Street (Route 3) between Old North Main Street railroad crossing to the traffic circle at Bridge Street. Work includes a crossing beneath the Plymouth & Lincoln Railroad at Old North Main Street. Installation of approximately 3,300 LF of cured-in-place pipe lining (CIPP) along Main Street, Green Street and South Street. Also included is select sewer manhole rehabilitation on Green St, South Street, Warren Street and Main Street.