THE WORK CONSISTS OF: Furnish all materials, equipment, and labor to apply asystematic aquatic herbicide to control variable milfoil at the Hopkinton-EverettLake Flood Control Project. Location consists of portions of Hopkinton Lake(Elm Brook Pool and Stumpfield Pool) and Drew Lake in Hopkinton, NH. Theperiod of performance shall be from contract award to December 31, 2021. Treatment shall start AFTER September 6, 2021 and BEFORE September 30, 2021(or as specified via Permit Application).
This procurement is set-aside for small business vendors. The applicable NAICScode is 541990 with a Small Business Size Standard of $16.5 Million.
ALL OFFERORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIMEOF SUBMISSION IN ORDER TO BE CONSIDERED. ANY OFFEROR THAT DOES NOTHAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NONRESPONSIVE.