Specifications include, but are not limited to: replacing the burners and controls on select equipment at the heating40plant. This includes replacing local controls on 3 natural gas and fuel oil boilers. The new Balance of41Plant control system will control all boilers, boiler auxiliary equipment and monitor the existing water42wells at SWC. All field instruments will be replaced with current technology. The burners and burner43management system for Boilers #2 and #3 will be replaced. The new burners will have increased44turndown capacity so that the boilers can operate efficiently year-round. Mud drum heaters will be45added to 3 boilers. A new central air compressor system will be added to serve the plant, boiler burners46and the campus air needs. Finally, this project will repair the inner and outer casing, insulation, and47refractory on three side of boiler #2.