Specifications include, but are not limited to: The project generally includes the construction of underground storm drainage, earthwork, roadway widening, curbs, sidewalks, driveway aprons and related work. Estimated quantities are as follows: 2.01 SITE PREPARATION, QTY LS 1; 3.01 UNCLASSIFIED EXCAVATION, QTY CY 1,681; 3.06 BORROW MATERIAL, QTY CY 1,119; 10.10 WING 6' EXTENSION, QTY EA 3; 10.14 WING 10' EXTENSION, QTY EA 2; 10.80 REBUILD INLET TOP, QTY EA 3; 11.10 REINFORCED CONCRETE, QTY CY 544; 11.11 CONCRETE PIPE COLLAR, QTY EA 1; 11.12 CONCRETE DITCH PAVING, QTY SY 7; 13.30C STORM DRAIN PIPE, 30" SIDE DRAIN, QTY LF 26; 13.36C STORM DRAIN PIPE, 36" SIDE DRAIN, QTY LF 8; 13.48C STORM DRAIN PIPE, 48" SIDE DRAIN, QTY LF 8; 13.63 CONCRETE PLUG ON EXISTING STORM DRAIN, QTY EA 2; 14.01 SOLID SODDING, BERMUDA, QTY SY 1,761; 16.01 MAINTENANCE OF TRAFFIC, QTY LS 1; 19.01 FINAL CLEANUP, QTY LS 1; 23.02 C-BALLAST, QTY TON 1,029; 23.04 STONE BACKFILL, QTY TON 294; 24.02 CHECK DAM (CD), QTY CY 5; 24.06 SEDIMENT BARRIER, SILT FENCE (SD1), QTY EA 3; 24.09 SEDIMENT BARRIER, BLOCK (SD4), QTY EA 3; 25.04 FENCE CHAIN LINK (4'), QTY LF 1,404; 25.14 FENCE WOOD (4'), QTY LF 71