All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: In general, this project, located on Underwood Creek, includes bioengineered bank stabilization and revegetation to stabilize an eroding bank on Underwood Creek near manholes for a sanitary sewer line. The work includes, but is not limited to, the following: 1. Access development and erosion, sediment, and pollution control.; 2. Diversion of Underwood Creek around the active work area and local dewatering of the work area.; 3. Earthwork to excavate the proposed bank to subgrade and construct the proposed bank treatments.; 4. Installation of stone and Fabric Encapsulated Soil Lifts on the bank; 5. Surface Fabric and Straw Blanket installation.; 6. Planting, seeding, and site restoration.