Specifications include, but are not limited to: This project is located along US Highway 93 (N-7), 3 miles south of Hamilton in Ravalli County. The project limits start at RP 43.6 located just south of the bridge over the Bitterroot River and extend to RP 43.8, just north of the bridge. This project will include placing riprap in areas where the existing concrete cable-tied blocks are missing or displaced.; MISCELLANEOUS WORK, QTY 30,000.000 UNIT; CONTRACTOR SURVEY AND LAYOUT, QTY 1.000 LS; CRITICAL PATH SCHEDULE, QTY 1.000 LS; MOBILIZATION, QTY 1.000 LS; REMOVE DEBRIS, QTY 1.000 LS; BMP ADMINISTRATION-LS, QTY 1.000 LS; TEMPORARY EROSION CONTROL-FIXED 500.000 UNIT REVEGETATION, QTY 1.000 LS; RIPRAP-CLASS 2 RANDOM, QTY 35.000 CUYD; RIPRAP-CLASS 3 RANDOM, QTY 158.000 CUYD; TRAFFIC CONTROL-FIXED, QTY 500.000 UNIT; TRAFFIC CONTROL-LS, QTY 1.000 LS; PERM EROSION CONTROL-HIGH SURV, QTY 69.000 SQYD