Specifications include, but are not limited to: 10 G100.010.0000 Mobilization and Demobilization All Required Lump Sum Lump Sum 20 G115.010.0000 Worker Meals and Lodging, or Per Diem All Required Lump Sum Lump Sum 30 G130.010.0000 Field Office All Required Lump Sum Lump Sum 40 G130.050.0000 Lodging 30 Each 50 G131.010.0000 Engineering Transportation (Truck) 1 Each 60 G131.020.0000 Engineering Transportation (ATV) 2 Each Construction Surveying by the Contractor 70 G135.010.0000 All Required Lump Sum Lump Sum 80 G135.020.0000 Extra Three Person Survey Party 100 Hour Contractor Safety Plan Compliance Document 90 G210.010.0000 All Required Lump Sum Lump Sum 100 P152.010.0000 Unclassified Excavation 500 Cubic Yard 110 P152.210.0000 Borrow - Modified Borrow B All Required Lump Sum Lump Sum 120 P185.010.0000 Primary Armor Stone, Class I (PA-1600) 5,000 Ton 130 P185.090.0000 Underlayer Stone, Class I (UL-160lb) 3,000 Ton Erosion, Sediment, and Pollution Control Administration 140 P641.010.0000 All Required Lump Sum Lump Sum Temporary Erosion, Sediment, and Pollution Control 150 P641.030.0000 All Required Lump Sum Lump Sum Temporary Erosion, Sediment, and Pollution Control Additives 160 P641.040.0000 All Required Contingent Sum Contingent Sum $0.00 170 P641.060.0000 Withholding All Required Contingent Sum Contingent Sum $0.00 180 P641.070.0000 SWPPP Manager All Required Lump Sum Lump Sum 190 P682.020.0000 Geotextile, Erosion Control 5,800 Square Yard 200 T901.080.0000 Seeding All Required Lump Sum Lump Sum