Specifications include, but are not limited to: This project consists of two (2) work areas. The scope of work for Work Area 1 is to expand the aircraft apron at John C Tune Airport north, towards T/W A and T/W R3 and includes the asphalt reconstruction of half of T/W R3. The pavement for this expansion will be bid as either concrete or asphalt. The scope of work for Work Area 2 is to provide a new access road, utilities, and airside infrastructure (including taxilanes, cross taxiways, and stormwater improvements) to serve the needs of future box hangar tenants (box hangar site preparation and building construction is not a part of this project). All pavement placed in Work Area 2 will be asphalt, regardless of the material used for the apron expansion in Work Area 1. Work Area 2 lies to the east of T/W A, between the JWN air traffic control tower and the TDOT State Hangar.