Specifications include, but are not limited to: 1. Contractor is responsible for obtaining all city permits through City Development Services Department prior to beginning work and include costs in proposal. 2. Contractor shall remove approximately #1,100 sq-ft of ceiling grid and tiles. Material is to be hauled offsite and disposed of in a professional manner. 3. Contractor shall provide new suspended ceiling grid and acoustical ceiling tiles (Armstrong preferred, Fine Fissured White, 2’ x 2’). 4. Contractor shall provide new ceiling HVAC fixtures (Supply, Return, Exhaust). 5. Contractor shall provide a licensed master electrician to perform all electrical work. 6. Contractor shall upgrade Facility light fixtures: 7. Contractor shall provide new LED lay in light fixtures to dormitory, hallway, captain’s quarter, kitchen, and day room. a. Minimum Specifications – Slim fit, flat panel, 5000K, 2x2 / 2x4 8. Contractor shall update existing ceiling recessed light fixtures with LED retro fit kits in all bath/shower rooms. 9. Contractor shall update existing wall light fixtures with LED retro fit kits in all bath/shower rooms. 10.Electrician to test Z-tron system to ensure correct fixtures are installed and working properly with the alert system. 11.Contractor shall conceal all exposed wires such as tv cables, speaker wires, etc. 12.Contractor to remove all vinyl flooring and prep to receive approximately 1,926 sq-ft new 6” x 48” Mohawk Living Local Two Tone 20 mil. LVT Plank flooring. 13.Contractor shall replace wall base throughout fire station. Approximately 280 linear feet. 14.Contractor to remove grid/tile ceiling in Rest Room #2 and replace with sheetrock, tape, float, and paint to match existing walls. 15.Contractor to Patch / Prime and Paint all interior walls, doors, and door frames. Paint color T.B.D. 16.Contractor will repair any areas scarified or damaged from construction