Specifications include, but are not limited to: 6. Testing The Contractor shall televise and mandrel the HDPE pipe thirty (30) days after construction. Any barrel deflection of the pipe (reduction of the barrel base inside diameter) greater than 5% will require the reinstallation or replacement of the pipe by the Contractor. Any penetration of the pipe that is encountered during televising will also be reinstalled or replaced by the Contractor, at no additional cost to the project. Repairs will be made per the manufacturer’s recommendation and as approved by the Construction Engineer. The cost of all testing shall be considered subsidiary to the HDPE pipe bid item, and will not be bid or paid for separately. Mandrel testing shall be completed per City of Wichita Standard Specifications. Televising of HDPE pipe shall be per the following. HDPE Storm Sewer Pipe – Televising Specifications All HDPE storm sewer pipe being televised by private companies shall conform to the following set of standards: Videos may be submitted by Compact Disc (CD) or DVD. CD's and DVD’s shall be of high quality and clarity. Videos and written logs shall be clearly labeled with project name, project number and clear reference to the location of storm sewer work