Specifications include, but are not limited to: 1.Removal and replacement of existing traffic signal equipment with newequipment,2.Resetting and installation of new granite curbing,3.Installation of ADA-compliant brick curb ramps.4.Removal of existing roadway pavement, sidewalk brick and subgrade, placement of proposed subgrade material, and installation of brick sidewalks and drivewayaprons,5.Roadway milling and surface paving,6.Drainage work associated with sidewalk reconstruction, including installation of subsurface stormwater infiltration areas, catch basins and catch basin leads,7.Coordination with abutters to minimize, to the extent feasible, disruptions to business, including retail operations, deliveries, and outdoor dining, and8.Replacement of approximately 600 linear feet of water main.