Specifications include, but are not limited to: On pavements designed by the Engineer, the bidder shall install pavement marking in preformed thermoplastic. The bidder will be responsible for: 1. Any measuring and layout for the installation of these markings.; 2. Any grinding, sweeping or surface preparation.; 3. Pavement grinding will be asphalt or concrete, or both.; 4. Pavement Marking Removal; 5. Any traffic management, traffic control devices or lane use permits.; 6. Any afterhours permits, lane use, or other permits which may be required; 7. Labor or equipment necessary to install these markings.; 8. Work with the individual schedule of public events or operations which might dictate when the work can be performed.