Specifications include, but are not limited to: Add 4” of gravel material to the roadway and other incidental work.; The road consists of 2 travel lanes including shoulders each being 14’ wide. Gravel placement will start at the end of pavement approximately 1.01 miles from Route 2/Silver Ridge Road continuing to East Shore Road to edge of pavement approximately 2.23 center lane miles.; 411.10 – UNTREATED AGGREGATE SURFACE COURSE, TRUCK MEASURE: • This item to be used in roadway and shoulders and must be placed by a paver.; • Using a Paver, the Contractor shall place 4” loose depth of new material gravel on each lane. Paver must have dual augers and be capable of spreading a minimum single lane width of 14’.; • Intersection and driveway gravel shall be tapered at a minimum length of four (4) feet per inch of transition depth or as directed by the Department.; • The Contractor shall use water for dust control as needed during installation.; • The Contractor shall compact material with a 10-ton Vibratory Roller or larger.; • The Contractor shall pre-wet material and as needed during compaction and/or as directed by the Department.