Specifications include, but are not limited to: f furnishing all plant, labor, equipment, and materials and performing all operations in connection with foundation preparation and construction of the Bayou Meto Basin Project Canal 1000 clay liner including any incidental earthwork and unwatering/ dewatering necessary to complete clay liner installation as shown in the plans and in accordance with Subsection 210 of the Standard Specification unless otherwise specified herein. The Contractor will be required to place and compact a relatively impervious, earthen liner two feet in thickness along the bottom and side slopes of Canal 1000 throughout the construction limits and to the lines, grades, thicknesses, and typical cross sections shown on the plans. The Contractor will also be required to tie into the existing ground line at each end of the construction limits.