Specifications include, but are not limited to: 2.1 This project is to replace fencing along the property line of Cedar Lake that was damaged in the derecho for the Parks and Recreation Department.; 2.2 All chain link to be installed shall meet current SUDAS specifications for chain link fencing, Section 9060 unless called out otherwise as follows.; 2.3 Existing fence will be removed by City staff prior to construction of new fence.; 2.4 The project runs along the property line between the Cedar Valley Nature Trail/Cedar Lake and the Cedar Lake Development Group. The total length of fence to be replaced is approximately 2,025 feet in length. Contractor is responsible for accurate measurements.; 2.5 The chain link fence shall be galvanized fencing 6 feet in height.; 2.6 All posts for the fence shall be hot dip galvanized SS40 posts.; 2.7 All pipe ends shall be fitted with non-removable caps or other secure terminal hardware.; 2.8 All components shall be of a galvanized or rustproof material.; 2.9 The city will have the property line surveyed to stake the exact location of the fence before construction. Contractor shall coordinate with Project Manager upon award of the contract.