Specifications include, but are not limited to: Valleywise Health invites sealed offers from qualified contractors to provide all labor, supervision, materials, replacement parts, supplies, tools, transportation, equipment and incidentals required to standardize the Heating, Ventilating and Air Conditioning Testing, Adjusting and Balancing throughout Valleywise Health facilities. The ventilation systems must be balanced for efficient and effective use of the HVAC systems. It is unlikely that any resultant contract will be used for commissioning, Valleywise Health reserves the right to do so if it is in the best interest of Valleywise Health. 2. RESPONSIBILITIES (Field Engineer/Project Engineer or Designee) Coordinate the Final Inspection with Appropriate parties Oversees/Participates in the Start-up, Test, and Inspection Process to ensure the Specifications and Procedures are followed. Certified technician Performs any testing, start-up, or inspection as dictated to ensure the warranty maintains its integrity; specifications, procedures and all codes are followed as required. Title II Inspector Independent Inspector for the NSF, who witnesses the testing, start-up and conduct their required inspections for the NSF.