Specifications include, but are not limited to: The Project includes the following Work: In accordance with the plans and specifications, this work consists of the construction of Municipal Wells No.1 & No.2, including pumps, well house structures, and Booster Station No.1 for the Spring Valley Phase 1 Water System. Work generally includes vertical well turbine pumps, motor and column pipe, earthwork, grading and stormwater systems at each site, construction of access with gravel and asphalt surfacing to each site, construction of enclosure structures including mechanical, electrical, controls, associated piping and other water system appurtenances at each site, and installation of stand-by generators with associated appurtenances at each site.