Specifications include, but are not limited to: Project consists of furnishing and installing approximately 1,554 linear feet of 18-inch CIPP Liner, 820 linear feet of CIPP Liner, and eight (8) CIP Manhole. Additionally, the Work includes but not limited to a sewer main flow control; and protecting, re-purposing, re-installing any existing amenities to remain.; 13. Dewatering; 14. Securing, permitting, maintaining, and restoring the materials staging area as necessary to complete the Work.; 15. Adjustment of sanitary sewer manholes to rim elevation.; 16. Conditions of the US Army Corps of Engineers (USACE) Nationwide Permits. See Section XIV Permits for additional information.; 17. Protecting trees from removal.; 18. Removal and disposal of all sewer utility amenities to be removed.; 19. Connections to existing items specified in the Contract Documents. This includes but not limited to items specified in the Contract Documents connecting existing pipe to construct sanitary sewer manhole, etc.; 20. Protecting, re-purposing, re-installing all amenities to remain (i.e. flow loggers, sensors, rain gauge, etc.); 21. Other items indicated on the Drawings or in these Specifications, but not specifically listed as a bid item in these Contract Documents.