All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: The Project consists of the design and construction of curb ramps at approximately 54 locations along US 250, CR 250/25, CR 250/91, CR 250/93, CR 250/94, CR 23, CR 25, CR 25/1, and CR 25/3 in Cameron to ensure ADA compliance. DOH intends to enter into a contract, which shall include but is not limited to: • Survey Services – no mapping will be supplied by the DOH; • Right of Way Acquisition – All necessary plans and acquisition of right of way to construct the Project if deemed necessary • Project Services – preparation of construction plans as detailed in the Project Scope and shall include but are not limited to Design and Project Management; • Utility Coordination and Utility Relocation Services; • Construction Services - necessary to build and ensure high quality workmanship of the designed facility; Construction will include but is not limited to all necessary roadway and bridge work, drainage, utility coordination, erosion and sediment control work items, necessary foundation work, substructure work, superstructure work and traffic control. Construction engineering and management, including material quality control, will be the responsibility of the Proposer. Proposer shall fully cooperate with, and provide a QC database to the DOH. This database must provide a complete documentation of sampling, tracking, and test results for all materials incorporated into the project. It will be utilized by the DOH in the performance of their quality assurance duties. Construction will comply with DOH Standard Specifications for Roads and Bridges 2017 as amended by the 2022 Supplemental Specifications, DOH Construction Manual (October 2006*), and any special provisions.