Specifications include, but are not limited to: 0005 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0010 410007-060 SUPERPAVE ASPHALT SKID PVT, TY 12.5 SY 62,783.000 _________._____ _________._____ 0015 415006-001 FINE MILLING SY 62,783.000 _________._____ _________._____ 0020 506001-003 CONCRETE PAVEMENT REPAIR, TYPE I, THICKNESS, 9 inches SY 1,649.000 _________._____ _________._____ 0025 601046-001 MODIFIED CONCRETE END POST EA 6.000 _________._____ _________._____ 0030 607001-001 TYPE 1 GUARDRAIL, CLASS I LF 9,762.500 _________._____ _________._____ 0035 607006-001 THRIE BEAM GUARDRAIL BRIDGE TRANSITION EA 6.000 _________._____ _________._____ 0040 607010-020 GUARDRAIL REMOVAL LF 9,937.500 _________._____ _________._____ 0045 607025-001 CUT SLOPE TERMINAL, TYPE A EA 2.000 _________._____ _________._____ 0050 607025-001 CUT SLOPE TERMINAL, TYPE B EA 2.000 _________._____ _________._____ 0055 607030-001 SPECIAL TRAILING END TERMINAL EA 5.000 _________._____ _________._____ 0060 607066-001 TANGENT END TERMINAL EA 1.000