Specifications include, but are not limited to: Vendor will develop a complete design including all engineering and architectural disciplines to prepare construction bid documents for West Virginia State Purchasing. Review existing plans and conditions as well as the operation of the schools and evaluate, while communicating effectively with the agency, to determine a plan that can be implemented in a manner that will minimize disruption to concurrent operation of the facility and meet all objectives. provide all necessary services to design the facilities described in this EOI in a manner that is consistent with West Virginia Schools for the Deaf and the Blind's needs, objectives, current law, and current code; while following the plan to design and execute the project within the project budget. Provide construction contract administration services with competent professionals that ensures the project is constructed and functions as designed. Drawings and specifications are to be submitted at 35%, 65%, 95% and 100%, cost estimates are to be revised and submitted with each submittal at 35%, 65%, 95% and I00%. Provide construction bid services to the WVSDB.; 2.1 Goal/Objective 1: The agency intends to design and construct a new campus entry and bus loop at the front of the campus and related site features to memorialize the Old Administration Building.; 2.2 Goal/Objective 2: The agency intends to design and install outdoor classrooms and a greenhouse or high tunnel.; 2.3 Goal/Objective 3: The agency intends to design and construct a truck accessible loading dock at the Sevigny Building.