Specifications include, but are not limited to: 1. Acquire Snow Removal and Deicing Equipment (Plow, Blower and Deice Vehicles) 2. Acquire Aircraft Rescue Fire Fighting Testing Equipment 3. Update 2022 Airfield PCI Study and Report PCR Data 4. Construct Airport Photovoltaic (PV) Solar Array Systems 5. Relocate Taxiway A (Phases 2, 3, 4 and 5) 6. Construct Taxiway J located west of Runway 18/36 – Phase 1 Grade and Drain 7. Construct Taxiway J located west of Runway 18/36 – Phase 2 Pave, Mark, and Light/Sign 8. Extend Taxiway H from Taxiway G to Runway 31 End 9. Reconstruct GA Apron 10. Rehabilitate or Replace Air Traffic Control Tower 11. Construct Aircraft Hangars 12. Renovate General Aviation Terminal Building and Supporting Infrastructure 13. Airfield Development, including Environmental/Plan/Study, archeological and other related studies