Specifications include, but are not limited to: The Work included under this Contract consists of but is not limited to the construction of vertical traffic calming devices, including permanent asphalt flat top speed humps and asphalt speed cushions, at the following locations: • Oceanview Drive, between Cape Circle and Bay Circle; • E 24th Avenue, between Forget-Me-Not Place and Cloverwood Loop; • Alder Drive, between E 20th Avenue and Kobuk Court; • Debarr Road, between Boston Street and Cross Pointe Loop; • Caribou Avenue, between Fireoved Drive and Taku Drive; • Taylor Street, between Peterkin Avenue and Parsons Avenue; Remove Pavement per SY, QTY 1,080 ; Grading Existing Surfaces per LF, QTY 355 ; A.C. Pavement (Class D) per Ton, QTY 125 ; Asphalt Flat Top Speed Hump per Each, QTY 5 ; Asphalt Speed Cushion per Each, QTY 6; Two-Person Survey Crew per HR, QTY 40 ; Inlaid Traffic Markings (Methylemethacrylate, 4" Yellow, 90 mil) per LF, QTY 2,200 ; Inlaid Traffic Markings (Methylemethacrylate, 8" Yellow, 90 mil) per LF, QTY 175; Standard Sign per SF, QTY 182; Traffic Maintenance per LS, QTY 1