Specifications include, but are not limited to: 0005 201001-000 CLEARING AND GRUBBING LUMP SUM LUMP SUM _________._____ 0010 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0015 207001-001 UNCLASSIFIED EXCAVATION CY 3,298.000 _________._____ _________._____ 0020 207002-000 SUBGRADE CY 444.000 _________._____ _________._____ 0025 207034-000 FABRIC FOR SEPARATION SY 3,270.000 _________._____ _________._____ 0030 240001-000 CLEAN CULVERT LF 71.000 _________._____ _________._____ 0035 307001-000 AGGREGATE BASE COURSE, CLASS 1 CY 512.000 _________._____ _________._____ 0040 408002-001 ASPHALT MATERIAL GA 40.000 _________._____ _________._____ 0045 415005-001 STANDARD MILLING SY 334.000 _________._____ _________._____ 0050 601002-001 CLASS B CONCRETE CY 4.000 _________._____ _________._____ 0055 605004-001 TYPE B INLET EA 4.000 _________._____ _________._____ 0060 606029-001 FREE DRAINING BASE TRENCH LF 55.000.