Specifications include, but are not limited to: 0005 201001-000 CLEARING AND GRUBBING LUMP SUM LUMP SUM _________._____ 0010 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0015 207001-001 UNCLASSIFIED EXCAVATION CY 741.000 _________._____ _________._____ 0020 207002-000 SUBGRADE CY 117.000 _________._____ _________._____ 0025 207034-000 FABRIC FOR SEPARATION SY 690.000 _________._____ _________._____ 0030 211001-000 UNCLASSIFIED BORROW EXCAVATION CY 456.000 _________._____ _________._____ 0035 307001-000 AGGREGATE BASE COURSE, CLASS I CY 120.000 _________._____ _________._____ 0040 307001-000 AGGREGATE BASE COURSE, CLASS 10 CY 52.000 _________._____ _________._____ 0045 408002-001 ASPHALT MATERIAL GA 170.000 _________._____ _________._____ 0050 601002-001 CLASS B CONCRETE CY 1.000 _________._____ _________._____ 0055 604050-016 18 INCH HIGH DENSITY POLYETHYLENE PIPE, PROFILE WALL LF 55.000 _________._____ _________._____ 0060 607001-001 TYPE 1 GUARDRAIL, CLASS I LF 75.000.