Specifications include, but are not limited to: construction of a new masonry building, electrical systems, pumping systems, stormwater piping, and underground infrastructure.; Preparing a Construction Site Management Plan in accordance with the City of Eugene Erosion Prevention standards and the contract documents.; Site clearing and tree removal.; Structural work including the construction of a new slab on grade masonry building and generator slab.; Furnishing and installing PVC drain and storm pipelines, and dedicated pump station piping.; Installing EWEB provided electrical equipment including an Automatic Transfer Switch (ATS), four variable frequency drives (VFDs), motor control center (MCC) and miscellaneous control system cabinets.; Installing conduits and wiring as shown on the drawings from the reservoir site to the pump station site.; Miscellaneous site work including final grading and driveway paving.; Demolition of an existing pump station.; Construction of a new structural slab in place of the existing pump station and installing an EWEB provided generator.