Specifications include, but are not limited to: For each move requested (“Move”) by the Owner, the Mover(s) will: 1.5.1 Meet with Move Coordinator and or OSU department representative (as applicable) to understand size, schedule and budget of each Move, including separate estimates if removal to Surplus is involved, moving supplies are required and broom cleaning is required. 1.5.2 Meet with the Move Coordinator or OSU department representative (as applicable) to advise schedule requirements, access to the occupied building and individual spaces, access to new building and spaces, staging and tagging for property to be moved, materials required for Move and communication strategy. 1.5.3 Visit the existing and new spaces to determine a cost estimate for the Move. 1.5.4 Provide detailed cost estimate to Move Coordinator or OSU department representative (as applicable) pursuant to Schedule of Charges. Cost estimate shall include: 1.5.3.1 Moving labor (at the applicable prevailing wage rate), vehicles, and fuel); 1.5.3.2 Parking; 1.5.3.3 Labor for personnel required for traffic control (if required); 1.5.3.4 Moving supplies as needed by unit – boxes, blankets, tape; 1.5.3.5 Cost for “broom cleaning” service of vacated space, if this service is requested by OSU; 1.5.3.6 Cost for elevator, wall or flooring protection in buildings (as applicable and as required); 1.5.3.7 Cost for Payment and Performance Bonds if the estimated cost of the Move will exceed $150,000.00; 1.5.3.8 Cost for insurance in excess of that required by the Master Contract; and 1.5.3.9 Estimate of other services that may be requested by OSU, if applicable. 1.5.3.10 All cost proposals must be submitted on the “Move Bid Calculation Form”, attached herein as Exhibit 1.