Specifications include, but are not limited to: 0010 107.51 PROSECUTION OF WORK - INITIAL SCHEDULE LUMP SUM LUMP SUM _________._____ _________._____ 0020 107.531 BI-WEEKLY UPDATES LS 1.000 _________._____ _________._____ 0030 201.23 REMOVING SINGLE TREE TOP ONLY EA 41.000 _________._____ _________._____ 0040 201.24 REMOVING STUMP EA 43.000 _________._____ _________._____ 0050 202.15 REMOVING EXISTING MANHOLE OR CATCH BASIN EA 61.000 _________._____ _________._____ 0060 203.20 COMMON EXCAVATION CY 46,800.000 _________._____ _________._____ 0070 203.21 ROCK EXCAVATION CY 500.000 _________._____ 0080 203.2312 HEALTH AND SAFETY PLAN LUMP SUM LUMP SUM _________._____ _________._____ 0090 203.2333 DISPOSAL TREATMENT OF SPECIAL EXCAVATION T 175.000 _________._____ _________._____ 0100 203.25 GRANULAR BORROW CY 100.000 _________._____ _________._____ 0110 206.061 STRUCTURAL EARTH EXCAVATION - DRAINAGE AND MINOR STRUCTURES, BELOW GRADE CY 100.000 _________._____ _________._____ 0120 206.07 STRUCTURAL ROCK EXCAVATION - DRAINAGE AND MINOR STRUCTURES CY 600.000