Specifications include, but are not limited to: project on Jenneville Roadinvolving ditching, berm removal, culvert replacements, and tree removal per the Municipal RoadsGeneral Permit standards. There are 10 cross culvert replacements, and approximately one half mileof ditching. Culvert outlets will be lined with 7” erosion stone. All ditching must be parabolic with aminimum width of 4ft where feasible, and road width permits. Approximately one half mile of bermremoval is required on the opposite side of the road. Along with some tree removal in the ROW.Contractor is responsible for all trucking of spoils, trees, and stone.Spoils are to be hauled to the abutter’s property on Ogden’s Mill Road.Trees are to be hauled to the town pit located on Ferry Road.Stonewillbehauledfromcontractor’schoice.The Town of Hartland will provide culverts and hydro seeding.