Specifications include, but are not limited to: INSTALLATION A. Placing Concrete: 1. Place concrete according to ACI 301. 2. Ensure that reinforcement, inserts, embedded parts, formed expansion and contraction joints are not disturbed during concrete placement. 3. Install vapor retarder under interior slabs on grade according to ASTM E1643. 4. Lap joints minimum 6 inches and seal watertight by taping edges and ends. 5. Repairs: a. Repair vapor retarder damaged during placement of concrete reinforcement. b. Using vapor retarder material, lap over damaged areas minimum [6] <________> inches and seal watertight. 6. Joint Filler: a. Separate slabs on grade from vertical surfaces with joint filler. b. Place joint filler in floor slab pattern placement sequence; set top to required elevations; secure to resist movement by wet concrete. c. Extend joint filler from bottom of slab to within 1/2 inch of finished slab surface. 7. Deposit concrete at final position, preventing segregation of mix. 8. Place concrete in continuous operation for each panel or section as determined by predetermined joints. 9. Consolidate concrete. 10. Maintain records of concrete placement, including date, location, quantity, air temperature, and test samples taken. 11. Place concrete continuously between predetermined expansion, control, and construction joints. 12. Do not interrupt successive placement and do not permit cold joints to occur.]